QUALITY CONTROL REQUIREMENT API 6A PSL 3 TO PSL3G AND PSL 4
Quality Control
Requirement as per API 6A 19th Edition
No |
Equipment |
Remark |
1 |
Wellhead,
Bonnet and other pressure containing bodies |
(Table
11) PSL 1, 2, 3/3G, 4 |
2 |
Stem |
(Table
13) PSL 1, PSL 2, PSL 3, PSL 4 |
3 |
Valve
Bore Sealing Mechanism |
(Table
14) PSL 1, PSL 2, PSL 3, PSL 4 |
4 |
Ring
Gasket |
(Table
15) PSL 1, PSL 2, PSL 3, PSL 4 |
5 |
Stud
and Nut |
(Table
16) PSL 1, PSL 2, PSL 3, PSL 4 |
6 |
Non
Metallic Sealing Material |
(Table
17) PSL 1, PSL 2, PSL 3, PSL 4 |
7 |
Assembled
Equipment |
(Table
20 – Full Bore Valve) PSL 1, 2, 3, 3G, 4 (Table
22 – Check Valve) PSL 1, 2, 3, 3G, 4 (Table
23 – body, bonnet, tree cap) PSL 1, 2, 3, 3G, 4 (Table
24 – X’mas Tree) PSL 1, 2, 3/3G, 4 |
8 |
Mandrel
Hanger |
(Table
25) PSL 1, PSL 2, PSL 3, PSL 4 |
9 |
Bull
Plug, VR Plug & BPV |
(Table
26) One requirement for all PSL |
Description |
PSL 3G Requirement |
PSL 4 Requirement |
Wellhead,
Tubing Head Adapter, Tee, Cross, Tree Cap, Cross Over Connector, Adapter and
Spacer Spool, Flanged Connector, Threaded Connector, Other End Connector |
PSL
3 requirement and PS-116 (gas test) |
PSL
3 requirement and PS-101 (UT) for PSL 4 or PS-109 (radiographic test) for PSL
4 and PS-116 (gas test) and no welding except PSL 3 weld overlay |
Mandrel
Hanger |
N/A |
PSL
3 requirement and PS-101 (UT) for PSL 4 or PS-109 (radiographic test) for PSL
4 and no welding except PSL 3 weld overlay |
X-Mas
Tree |
PSL 3 requirement |
PSL 3 requirement |
No comments:
Post a Comment